Johns Lakester
Target
150+ Mph, March 2002 2003
Construction.
March
2001
Updated 03/12/01
June 2000
The tank was dismantled. This took most of a day, as access into the tank is via the filler holes. The tank was separated into 3 parts, with the baffles removed.
You can E-mail me at: ![]()