Diablo Boat Construction

Page 3 - Taping the joins

Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Links Fishing
email us
16/02/2003 All sanded ready for the glass tape16/02/2003 Working on the tape
16/02/2003 The exterior seams all taped26/02/2003 Working on the frame fillets
26/02/2003 The middle frames are cut down to seat level 26/02/2003 and filleted and glass taped
26/02/2003 Close up of the taped fillets01/03/2003 Chine log fillets done
01/03/2003 All the fillets are done01/03/2003 including the stem

Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Links Fishing
email us
Last updated on November 2, 2003