| Page 1 | Page 2 | Page 3 | Page 4 | Page 5 | Page 6 | Page 7 | Page 8 | Page 9 | Links | Fishing |
![]() | ![]() |
| 16/02/2003 All sanded ready for the glass tape | 16/02/2003 Working on the tape |
![]() | ![]() |
| 16/02/2003 The exterior seams all taped | 26/02/2003 Working on the frame fillets |
![]() | ![]() |
| 26/02/2003 The middle frames are cut down to seat level | 26/02/2003 and filleted and glass taped |
![]() | ![]() |
| 26/02/2003 Close up of the taped fillets | 01/03/2003 Chine log fillets done |
![]() | ![]() |
| 01/03/2003 All the fillets are done | 01/03/2003 including the stem |
| Page 1 | Page 2 | Page 3 | Page 4 | Page 5 | Page 6 | Page 7 | Page 8 | Page 9 | Links | Fishing |