Pictures of a second storey addition at Kanwal

The roof has been stripped and and the wall of the new double garage can be seen to the left of the building

The floor framing and sheet flooring have been installed

The frame goes up

The roof tiles go on and the brickwork is finished off

The completed Addition
Back to main menu
Last Updated 19th October 2000
© copyright 1998 Mal Murrell(webmaster)
any comments send them to me email :
Mal